Environmental Protection Act duty of care
Businesses producing or handling controlled waste must take reasonable steps to manage it correctly, use authorised carriers and retain the required transfer information.
Commercial drainage PPM and surveys
Scope planned cleaning, surveys and condition evidence around the actual drainage network, site activity, blockage history, pollution risk and operational constraints.
Scope confirmed firstPremises, systems and required output agreed before instruction.
Appropriate competenceThe delivery route is matched to the agreed specialist scope.
Usable written evidenceReports and findings are returned against the correct site.
Discipline-specific methodThe approach and evidence are matched to commercial drainage maintenance.
Service overview
The programme may combine planned cleaning, jetting, gully and channel maintenance, internal wastewater pipework, CCTV surveys, mapping, interceptor or grease-system service and tankering. Each activity, access point, output and waste route should be stated explicitly; a clearance visit and a condition survey are not the same service.
Get the right scope for my siteRegulatory framework
These summaries identify the principal framework in England, Wales or Great Britain as labelled. The exact duty depends on jurisdiction, premises, equipment, use and the party in control.
Businesses producing or handling controlled waste must take reasonable steps to manage it correctly, use authorised carriers and retain the required transfer information.
Businesses should understand their drains, keep suitable plans, inspect drainage and maintain separators or other controls relevant to their activities.
Certain non-domestic discharges to a public sewer require consent or agreement with the sewerage undertaker. Whether a discharge is trade effluent depends on the actual activity and effluent.
A chamber is not automatically a confined space, but where the legal definition and specified risks are present, entry should be avoided where possible and otherwise controlled through a suitable safe system and emergency plan.
Scope of service
Before appointment, we confirm the required output, available evidence, access limitations and the areas, systems or assets included in the instruction.
Reporting output
How it works
Confirm known issues, plans, previous reports and operating constraints.
Separate cleaning, survey, mapping, tankering, repair and project requirements.
Agree access, safe systems, waste arrangements and site communications.
Issue the agreed record, limitations, defects and next maintenance actions.
Built for the people managing the risk
Choose the route closest to your role and property type. The technical scope stays specific to this service while access, communication and reporting reflect the operating environment.
Coordinate busy sites, trading windows and consistent drainage records.
See the sector approachAdd defined specialist drainage scopes to existing client contracts.
See the sector approachPlan around high footfall, wet areas, kitchens and varied estate assets.
See the sector approachManage communal drainage, basement assets and shared responsibilities.
See the sector approachTechnical and procurement questions
The correct service depends on the premises, systems, equipment, use and dutyholder position. These points are confirmed before appointment.
Request a scoped quotationNo. CCTV, cleaning, jetting, mapping, defect coding and footage should be identified explicitly in the quotation. Access, blockage or system condition may prevent a complete survey, and any limitation should appear in the report.
No. It records the accessible condition and findings within scope. Design adequacy, ownership, adoption, discharge permissions or environmental compliance may require different records and specialist advice.
There is no single interval for every site. Frequency should reflect site use, network design, blockage or incident history, seasonal conditions, contamination risk and the consequence of failure.
Yes, where the exact asset, waste type, access, service activity and disposal route are confirmed. Environmental permits, trade-effluent consent or manufacturer requirements may require separate consideration.
Yes. The programme can use one asset taxonomy, scope and reporting structure while retaining site-specific plans, access, findings, waste records and responsibilities.
Request a quotation
Tell us about the property, system or equipment involved and what has prompted the instruction. We will confirm the information required before issuing a proposal.